The project comprises a 4.8km long tunnel linking up Sha Tau Kok Road interchange and Fanling Highway interchange, 3 ventilation buildings and an administration building. The Tunnel Boring Machine was used, along with drill and blast solutions.
+(44) 1785 660005 | [email protected]
+(852) 5712 7282 | [email protected]
+(971) 42 43 2607 | [email protected]
+(612) 8317 3608 | [email protected]
+(31) 234568248 | [email protected]
+(65) 3159 1010 | [email protected]
Indata (Partner)
+(55) 11 5594-7172 | [email protected]
Solstice Digital Solutions (Partner)
+(39) 324 5653064 | [email protected]
Asia Headlands (M) Sdn Bhd (Partner)
+(60) 12 3479 323 | [email protected]
VDB Dynamic (Partner)
+(27) 82 223 8407 | [email protected]
Preston Asset Management (Partner)
+(66) (0) 65 647 4778 | [email protected]
Copyright © 2018 SnagR Ltd | All Rights Reserved | Privacy Notice | Available on iOS and Android.