SnagR…(is) working well with the teams on-site and I have had positive feedback.
- Katie, Site Engineer at VSL
The Level Crossing Removal project in Melbourne (Caulfield to Dandenong) involves the removal of nine of Melbourne’s most congested level crossings along the Caulfield to Dandenong rail corridor. Apart from elevating the longest viaduct in Victoria along the busiest rail line in Melbourne, it is also the first viaduct project to erect span-by-span using a specialised straddle carrier and launching system.
VSL uses SnagR in its project to supply and install the 87 precast concrete box girder segments either side and above the existing rail tracks – whilst the current rail network remains in service.
+(44) 1785 660005 | [email protected]
+(852) 5712 7282 | [email protected]
+(971) 42 43 2607 | [email protected]
+(612) 8317 3608 | [email protected]
+(31) 234568248 | [email protected]
+(65) 3159 1010 | [email protected]
Indata (合作夥伴)
+(55) 11 5594-7172 | [email protected]
Solstice Digital Solutions (合作夥伴)
+(39) 324 5653064 | [email protected]
Asia Headlands (M) Sdn Bhd (合作夥伴)
+(60) 12 3479 323 | [email protected]
VDB Dynamic (合作夥伴)
+(27) 82 223 8407 | [email protected]
Preston Asset Management (合作夥伴)
+(66) (0) 65 647 4778 | [email protected]